Many different technical means are used in the construction industry. In particular, various designs of bridge cranes and other lifting mechanisms are used for the construction of high -rise buildings and structures. It is worth saying that all lifting devices designed to move the cargo to a certain height are mounted directly at construction sites. Professional experts carry out such work, since the installation of a crane is a laborious and responsible process. Indeed, the safety of the entire construction process depends on the correct functioning of the complex, bulky technique. In this case, competent engineering calculations, professional skills and appropriate tools are required. In addition, the installation of bridge cranes is considered the work of increased danger, in which a special technology should be strictly observed. Therefore, such work is entrusted with specialized teams of engineers and workers who are in the staff of companies who are registered in self -regulatory organizations, that is, have appropriate admission to such work. Such admission can be received by organizations whose workers are certified and have appropriate qualifications. If necessary, such organizations are entrusted, including major repairs of the path.
Which includes a set of installation works?
– In the beginning, projects of crane overpasses are being developed, built -in skill tracks are designed
– The readiness of the facility for work is being verified in accordance with the project
– The installation work of suspended or supporting crane tracks is carried out directly
– The bridge of the crane, end beams, crane trolleys, etc. D.
– Cable and trolley currents are connected, electrical equipment is connected
– Start -up work is carried out in order to determine the correctness of the mechanical and electrical parts of the bridge crane, that is, trial starts are carried out, the action of the lifting and movement mechanism is checked, all devices are regulated
– Conduct functional tests, checking the technical preparedness of the equipment for work, these tests are carried out without load.
Before the crane beams are put into operation, the equipment undergoes a full technical examination in accordance with the Rules for the safety of the operation of lifting cranes.