Bridge cranes – installation and starting into work

  • January 18, 2019

Many different technical means are used in the construction industry. In particular, various designs of bridge cranes and other lifting mechanisms are used for the construction of high -rise buildings and structures. It is worth saying that all lifting devices designed to move the cargo to a certain height are mounted directly at construction sites. Professional experts carry out such work, since the installation of a crane is a laborious and responsible process. Indeed, the safety of the entire construction process depends on the correct functioning of the complex, bulky technique. In this case, competent engineering calculations, professional skills and appropriate tools are required. In addition, the installation of bridge cranes is considered the work of increased danger, in which a special technology should be strictly observed. Therefore, such work is entrusted with specialized teams of engineers and workers who are in the staff of companies who are registered in self -regulatory organizations, that is, have appropriate admission to such work. Such admission can be received by organizations whose workers are certified and have appropriate qualifications. If necessary, such organizations are entrusted, including major repairs of the path.

Which includes a set of installation works?

– In the beginning, projects of crane overpasses are being developed, built -in skill tracks are designed

– The readiness of the facility for work is being verified in accordance with the project

– The installation work of suspended or supporting crane tracks is carried out directly

– The bridge of the crane, end beams, crane trolleys, etc. D.

– Cable and trolley currents are connected, electrical equipment is connected

– Start -up work is carried out in order to determine the correctness of the mechanical and electrical parts of the bridge crane, that is, trial starts are carried out, the action of the lifting and movement mechanism is checked, all devices are regulated

– Conduct functional tests, checking the technical preparedness of the equipment for work, these tests are carried out without load.

Before the crane beams are put into operation, the equipment undergoes a full technical examination in accordance with the Rules for the safety of the operation of lifting cranes.

Share
Tweet
Pin it
Share
Share
You May Also Like
View Post

ASUS has introduced a mouse with a built-in aroma oil diffuser

  • March 5, 2025
View Post

Lenovo unveils solar-powered laptop

  • March 5, 2025
View Post

MacBook Air and iPad Air to feature new processors

  • March 5, 2025
View Post

replacing the rear brake pads.

  • January 23, 2025
View Post

Plant in Dagestan industry news

  • January 22, 2025
View Post

Docke vinyl siding: a new word in facades cladding

  • January 16, 2025
View Post

One of the complex environmental problems is garbage removal in large megacities. Large -scale construction, reconstruction of existing buildings and structures forms hundreds of tons of construction garbage. Numerous shopping centers, catering enterprises, offices and residential buildings leave a huge number of household waste.

  • January 14, 2025
View Post

Exposure from the Unified State Register Online

  • January 13, 2025
Featured Posts
  • Lada Granta: characteristics, design description, photo
    • September 21, 2018
  • A great reliable friend. Subtleties of street umbrellas.
    • May 22, 2018
  • Under Moscow, the construction of the route for royal races approaches the final stage
    • January 29, 2019
  • Construction work
    • December 12, 2024
  • Replacement of oil scrap caps VAZ 2109
    • January 21, 2025
Recent Posts
  • ASUS has introduced a mouse with a built-in aroma oil diffuser
    • March 5, 2025
  • Lenovo unveils solar-powered laptop
    • March 5, 2025
  • MacBook Air and iPad Air to feature new processors
    • March 5, 2025
XToner – all about computer technology
  • © 2017-2024 x-toner.com. All Rights Reserved.

Input your search keywords and press Enter.