Building a building from a bar in winter. Perhaps the largest obstacle in construction in winter is severe frosts. Although with all this, frost, as it is not phenomenal, at one time reduces the deadlines for the delivery of the house.
It turns out during the construction in winter the “cold” forest is most often used, t. e. in the period of low temperatures. In such wood, there is no movement of juices, it is more dried up, since the moisture in it is frozen by cold. With the long -term use of such a forest, almost a year is saved – this is how much is needed for tincture of a log house installed from raw logs.
Reason 1
There is no need to abstain a log house from the “cold” forest for such a long time, since it is already quite dried, and from here it is practically not covered with cracks not deformed. A similar house in the summer season will become absolutely ready for internal grinding.
Reason 2
In winter, the tree does not rot. Frost prevents the occurrence of insects feeding wood. In the winter, the air is dry, the main factor in the propagation of harmful microorganisms, fungus and mold is absent- humidity- humidity. Before the coming of summer and increasing dampness about this dilemma, you can forget.
Therefore, the course of work is reduced by a time that would be spent on the finish of the log house by disinfecting.
Reason 3
If you intend to use the proposals of the construction of companies, in winter it will be much more economical. In this period, the smallest applications are the smallest, and therefore the discount is more, both to work and for the construction, material.
Almost many people know what problem it is to hire well -known building professionals in the midst of the season. In winter, you can easily find any professional you need from among those that in the summer and rewards will become in vice.
Reason 4
In the summer, during the construction you need to lay a separate note of time and means to clean the construction area. This is not relevant in winter. Absolutely all construction waste can be removed at once with snow, spending a minimum of effort and time on this.
Finally, it is worth saying that saving time and means in the construction in the winter will be significant provided that the foundation of the house has already been built to the source of work. Winter sealing of the founding of the house will cost 15-20 % more expensive than in the summer, and will demand huge labor costs. To everything else, professionals do not advise in winter to lay down the zero cycle due to the high risk of lowering the properties of concrete and deformation of the foundation.