Companies carry out the construction of country houses according to any of the 500 standard projects, or will prepare for you an individual version of a residential building, taking into account your wishes.
After your choice of the project, the company will calculate the full cost of the kit of the house and prepare a detailed estimate of construction. After its approval between the customer and the company, the purchase agreement will be concluded.
After drawing up the contract, you will be provided with a drawing of the foundation of the future house and all architectural drawings, including calculations, with bindings of partitions, cuts and facades to them. The development of drawings is carried out by the company for three weeks.
Over the next 10 weeks, the ordered set will be made at the OMATALO plant – the box of the house.
Technological stages of building a frame cottage that the company performs:
1. Preparation of the site for construction:
-erection of the foundation;
-Calculation of engineering networks: electric, tap, sewer, heating, ventilation.
-implementation of inputs of all engineering communications at the stage of erecting the foundation of the house.
2. The house is delivered from Finland in the form of modules, ready for installation. The assembly work is carried out by the team of experienced certified specialists. A guarantee of 10 years is given to the supporting house structures, for window and door blocks – 2 years. A building of a total area of 100 m2 is mounted within a week. Work can be done in any weather conditions, with the exception of strong precipitation.
3. The company offers various roofing options:
-tiles;
-soft tiles (Katepal, Finnish production);
-metal tile.
Root roof structures are able to withstand extreme snow loads: 100 kg of snow per 1 m2.
4. The external cladding of the house can be performed using various finishing materials:
-lining;
-Aquapanels. On the panel, plaster is applied as a finish coating;
-facing brick;
-fiber cement panels.
A vertical wooden lining treated with a protective antiseptic coating and primed can be mounted on panels in the factory and delivered already in the collected form.
5. The interior decoration includes the construction of partitions, laying engineering communications, laying floors and wall decoration.