The desire to have your own country house is most often rested on a monetary issue. The construction of brick, aerated concrete and wooden houses flies into a penny, and here, it would seem, it would be time to remember that after all, they are building turnkey frame houses that differ in low cost. However, the notorious Canadian or Finnish houses that Europe, America, Japan and other countries have long been using, have not yet gained proper confidence among the population of our country. The main reasons for this are the lightweight of structures and the speed of the structure. The latter, it would seem, should please-you will not have to wait for two long years, while it will be possible to enter your own home, but many as an argument against frame houses put forward the thesis that it is impossible to build a truly solid building in such a short time.
Most of the construction companies specializing in frame houses set the deadlines for their construction for a month and a half. Let’s try to trace the eye of an outsider, what is being done on the construction site during this time and what stages the construction of a frame house consists.
The first stage, as in any other construction, consists in the construction of the foundation. Since the construction of the house is quite light, then in the case of frame houses, a finely polluted strip foundation is most often used from a lightweight monolithic slab. Simultaneously with the foundation, if necessary, you need to take care of laying pipes for entering/going out communications.
At the second stage, delivery of ready -made, structures made in the factory is provided for an object. After that, the lower binding and overlap for the first floor are carried out, sewer drain pipes are installed.
At the third stage, there is a flooring of the draft floor, accompanied by its insulation. Next, the floor is sewn up and proceed to the construction of the walls, in which the fourth stage of construction is consistent. Wall panels and internal partitions are installed on the finished floor. The frame of the house is formed by clutch the plates with the help of galvanized fasteners. If the project of the house provides for the presence of the second floor, then it is time to engage in the installation of floors, and then repeat the procedure for the construction of walls and partitions.
When the walls are ready, the turn of the roof comes – the fifth stage of the construction of the frame house. Rraft systems are installed for its construction, on top of which vapor barrier is laid and the crate is tripled. This follows the installation of the roofing – usually it is a bitumen or metal tile.
The sixth stage is the installation of windows and doors, as well as the work on preparing and conducting external sheathing and decoration of walls, installing insulation and vapor barrier. Also at this stage, work is underway to lay communications, heating, ventilation and air conditioning systems.
When the entire internal wiring is completed, you can sew the inner walls with drywall and proceed to the most pleasant – small strokes that will help turn the newly -made structure into a cozy and comfortable house. Now it is quite possible to start installing plumbing and built -in furniture, cut the door locks and breathe in the house by connecting it to communications systems.
It remains only to engage in the arrangement of life, but it is quite possible to cope with this without construction companies. You can, of course, go through all the previous stages on your own, using the help of friends, relatives and hired construction teams. However, it is better to entrust your home to professionals, especially some construction companies, when ordering construction, provide a project for a house gift.